Build-up

Follow step by step how one of our semi built house is transformed in to a fully livable vacation home. Visit again later, we will add information during building period.

Step 1

We start with a semi built house where about 25 % of all work is all ready done. It will take 1-2 months to finish the complete build-up - depending on design and quality chosen by customer.

The small entrance door is temporary and can be used later as a bathroom door.

Step 2

Time to complete the floor. A stable floor is one of the most important part of a building, next to the roof. That is why we use real steel to support the floor. This makes the floor very stable, longstanding and will not sway when you walk on it.

Step 3

Windows and front sliding door prepared (UPVC) and exterior walls finished and ready to be painted. Outer wall material is so called ConWood, it is made of fiber-cement but looks like wood. Very durable, heat, weather and insect resistant.

Step 4

Walls with high quality plywood in place. Electric cabling prepared. Bathroom built up. Behind this space there is room for a double bed.

Step 5

Shower room completed 90%. Floor and walls with vinyl that will last for long and will not leak. Kitchen with red colored wall of glass fiber that is water resistant and easy to clean. All other walls with paper wall paper. Ceiling completed.

Last step

99% finished, remains to connect electric, water and waste water.

Ready to move in

House finished. Time to move in. Welcome to Palm View Residence

 